Client: David Kelly
Site Address: 22 Stroud Road, Wimbledon, SW19 8DP
Prepared By: David Hall, MK Build LTD
Quote Date: 17 June 2025
Quote Valid For: 30 days
Dear Mr Kelly,
This quote outlines the full rewiring of a standard 3-bedroom terraced house in line with current UK electrical regulations (18th Edition). The scope includes complete removal of the existing electrical system and the installation of new cabling, sockets, lighting, and consumer unit, ensuring the property is safe, compliant, and future-proofed for modern electrical demands.

Complete Rewire Of 3 Bedroom Terraced Property
The works will involve a full electrical rewire of your 3-bedroom terraced property, including new cabling, sockets, switches, lighting, consumer unit, and certification in line with the latest regulations. All existing wiring will be safely removed and replaced.
Completion Timeframe: 5-6 days
Payment Terms: 25% upfront, balance settled in 3 stage payments
Total: £5,820.89
(Inclusive of VAT). Labour and basic materials included. Fixtures/fittings to be supplied by client.
Summary of works
Phase 1: Strip-Out & First Fix Wiring
We will remove the existing system and install new cabling runs, back boxes, and bonding.
Includes:
- Site clearance
- Removal of all waste
- New cables
Cost: £400
Timeframe: 2 - 3 days
Phase 2: Second Fix Installation
Sockets, switches, light fittings, consumer unit, and appliances will be installed and wired in.
Includes:
- Brick/block external walls
- Damp proofing and insulation
- Roof frame and tiling
Cost: £1,400
Timeframe: 2 days
Phase 3: Testing & Certification
We will conduct full safety tests and provide NICEIC/NAPIT certification.
Includes:
- Fit bi-fold doors
- UPVC windows
- Install any rooflights (if agreed)
Cost: £3000
Timeframe: 1 days
Services & Materials:
Full Electrical Strip-Out
Safe removal and disposal of all existing wiring, sockets, switches, and outdated consumer unit.
Quantity: Whole property
Total: £400
New Wiring Installation
Supply and fit new cables throughout the property for lighting, sockets, and appliances, meeting latest building and safety regs.
Quantity: 3 bedrooms, lounge, kitchen, hallway, landing, bathroom
Total: £1,400
Sockets & Switches
Installation of new white plastic sockets and switches in all rooms, positioned as per standard layout.
Quantity: Approx. 30 units @ £20 each
Total: £600
Lighting Installation
New pendant lighting points in all rooms, including bathroom-rated lighting in wet areas.
Quantity: 7 light points @ £60 each
Total: £420
Kitchen & Appliance Feeds
Dedicated circuit for oven, hob, and kitchen sockets. Includes isolators and RCD protection.
Quantity: Full kitchen circuit
Total: £480
Consumer Unit Upgrade
Installation of a modern 18th Edition dual RCD metal consumer unit with RCBOs for all circuits.
Quantity: 1 unit + labour
Total: £500
Smoke & Heat Detectors
Installation of mains-powered smoke alarms (with battery backup) to hallway and landing, plus heat detector in kitchen.
Quantity: 3 detectors
Total: £150
Bonding & Earth Upgrades
Gas and water main bonding as required to meet regulations.
Quantity: 2 main bonds
Total: £100
Testing & Certification
Full electrical test and commissioning. NICEIC or NAPIT Electrical Installation Certificate issued on completion.
Quantity: Full property
Total: £400
Making Good
Basic filling and patching of chased walls post-install. (Note: does not include painting or final decoration.)
Quantity: All affected areas
Total: £400
Terms & Conditions:
Payment Schedule
To secure your booking, a 10% deposit (£7,200 excl. VAT) is required. A further 40% is due at the start of the structure phase, followed by 30% upon commencement of second fix works, and the remaining 20% upon completion and snagging sign-off.
Project Duration
The estimated timeframe for completion is 6 to 8 weeks, depending on weather conditions and the smooth progression of works.
Working Hours
Our team operates Monday to Friday, from 8am to 5pm. However, we aim to be flexible where needed to suit your schedule or project needs.
Quote Validity
This quote is valid for 30 days from the date of issue. After this period, pricing may be subject to adjustment due to material costs or availability.
Insurance
We carry comprehensive public liability insurance, with coverage up to £20 million, to give you complete peace of mind throughout the project. Pleae ask for more details.
Planning & Building Regulations
It is assumed that planning permission and building control arrangements are the client’s responsibility, unless agreed otherwise in writing before works commence.
Unforeseen Works
If we encounter any hidden issues—such as poor soil conditions, existing drainage problems, or the discovery of asbestos—we will notify you immediately. These will be discussed and quoted for separately, outside of the original scope.
Snagging
We take pride in finishing all works to a high standard. Any final snagging or minor fixes will be completed within 5 working days of practical completion.